Recent Bridge & Tunnel Alerts




The Goethals Bridge to NJ is experiencing a delay of 15-20 minutes due to one lane closed for construction on the NJTPKE approach to Exit 13.




All upper level lanes to NY now reopened.




The Bayonne Bridge is now fully opened.




The Bayonne Bridge to is now closed for construction until 5 a.m. Please plan alternate route.




3 of 4 lanes on the GWB Upper Level now closed for construction until 5 am. Passenger vehicles: Use lower level to avoid delays.




The Bayonne Bridge will be closed in both directions tonight from 9 p.m. to 5 a.m. Please plan alternate route.




Tonight at 9 pm, 3 of 4 UL GWB bridge lanes to NY closed for deck rehab. Passenger vehicles: Use lower level to avoid delays. Will accept cash/E-zpass




The Bayonne Bridge will be closed in both directions tonight from 9 p.m. to 5 a.m. Please plan alternate route.




The Bayonne Bridge will be closed in both directions tonight from 9 p.m. to 5 a.m. Please plan alternate route.




The previous alert at the GWB Upper to NY due to emergency maintenance is no longer in effect. There may be residual delays.




The previous alert at the GWB Upper to NY due to emergency maintenance is no longer in effect. There are residual delays.




The previous alert at the GWB Upper to NY due to emergency maintenance is no longer in effect. There are residual delays.




The GWB Upper to NY is experiencing a delay of 60 minutes due to emergency maintenance. Passenger vehicles should use the Lower.




Emergency Maintenance on GWB Upper Level to NY. Passenger vehicles should use the Lower Level to avoid a delay.




The Lincoln Tunnel to NJ is experiencing a delay of 45 minutes due to a fire.




The previous alert at the Lincoln Tunnel to NJ due to a disabled vehicle is no longer in effect. There may be residual delays.




The Lincoln Tunnel to NJ is experiencing a delay of 30 minutes due to a disabled vehicle.




The Lincoln Tunnel to NY is experiencing a delay of 45 minutes due to the general volume of traffic.




The GWB Upper to NY is experiencing a delay of 45 minutes due to the general volume of traffic.




GWB to NY- all 4 lanes Upper Level are now open.




The Bayonne Bridge is now open.




The previous alert at the GWB Upper to NY due to construction is no longer in effect. There may be residual delays.




The GWB Upper to NY is experiencing a delay of 60 minutes due to construction.




The previous alert at the GWB Lower to NY due to construction is no longer in effect. There may be residual delays.




The GWB Upper to NY is experiencing a delay of 90 minutes due to construction.




The GWB Lower to NY is experiencing a delay of 45 minutes due to construction.




The GWB Upper to NY is experiencing a delay of 45 minutes due to construction.




The Bayonne Bridge to is now closed for construction until 5 a.m. Please plan alternate route.




3 of 4 lanes on the GWB Upper Level now closed for construction until 5 am. Passenger vehicles: Use lower level to avoid delays. Will accept cash/E-zpass.




The previous alert at the Bayonne Bridge to NY due to an overturned truck is no longer in effect. There may be residual delays.




The previous alert at the Lincoln Tunnel to NY due to a disabled vehicle is no longer in effect. There may be residual delays.




The Lincoln Tunnel to NY is experiencing a delay of 30 minutes due to a disabled vehicle.




The Bayonne Bridge will be closed in both directions tonight from 9 p.m. to 5 a.m. Please plan alternate route.




The previous alert at the GWB Upper to NY due to an incident on Cross Bronx Expy is no longer in effect. There may be residual delays.




The Lincoln Tunnel to NY is experiencing a delay of 45 minutes due to the general volume of traffic.




The GWB Upper to NY is experiencing a delay of 60 minutes due to an incident on Cross Bronx Expy.




The Lincoln Tunnel to NY is experiencing a delay of 30 minutes due to the general volume of traffic.




The Lincoln Tunnel to NJ is experiencing a delay of 15 minutes due to construction.




The Lincoln Tunnel to NJ is experiencing a delay of 15 minutes due to construction.




The Lincoln Tunnel to NJ is experiencing a delay of 15 minutes due to construction.




The previous alert at the Goethals Bridge to NY due to an incident on the Staten Island Expressway is no longer in effect. There may be residual delays.




The previous alert at the Outerbridge Crossing to NY due to heavy volume is no longer in effect. There may be residual delays.




The Goethals Bridge to NY is experiencing 20-30 minute delays on the bridge and toll plaza as a result of continued heavy traffic on 278 eastbound that has backed traffic through the Goethals Bridge toll plaza. The Bayonne Bridge to NY has no delays.




The approach to the Outerbridge Crossing to NY continues to experience a delay of 30-40 minutes due to increasing traffic volume.




The Goethals Bridge to NY is experiencing intermittent 5 - 10 minute delays on the toll plaza. Continued heavy traffic on 278 eastbound has backed traffic through the Goethals Bridge toll plaza. The Bayonne Bridge to NY has no delays.




The Goethals Bridge to NY is experiencing intermittent 5-10 minute delays after the toll plaza due to heavy traffic on 278 eastbound.




The approach to the Outerbridge Crossing to NY is experiencing a delay of 30-40 minutes due to increasing traffic volume.




The approach to the Outerbridge Crossing to NY is experiencing a delay of 10-15 minutes due to increasing traffic volume.




The Goethals Bridge to NJ is experiencing a delay of 5-10 minutes due to increasing traffic volume..




Web Site Disclaimer
Powered by eAlert®. Copyright 2001-2013 by MIS Sciences Corporation. All rights reserved
Design and functionality is proprietary information of MIS Sciences Corporation.

The Port Authority of New York and New Jersey
(212) 435-7000  •  225 Park Avenue South, New York, NY 10003